Document cancelledby section
This commit is contained in:
parent
63b43c7e66
commit
9589ce203a
1 changed files with 51 additions and 0 deletions
|
@ -202,6 +202,57 @@ options are:
|
||||||
| | | Values: ``on``, ``off``. Default: ``off`` |
|
| | | Values: ``on``, ``off``. Default: ``off`` |
|
||||||
+-------------------+------------+---------------------------------------------------------+
|
+-------------------+------------+---------------------------------------------------------+
|
||||||
|
|
||||||
|
Cancelledby section
|
||||||
|
-------------------
|
||||||
|
|
||||||
|
At times it may be desirable for one task to be able to stop another task early,
|
||||||
|
such as when a ``prove`` task and a ``bmc`` task are testing the same properties
|
||||||
|
and the ``prove`` task finishes first, making the ``bmc`` task redundant. This
|
||||||
|
is where the optional ``[cancelledby]`` section comes in. Each line corresponds
|
||||||
|
to the name of a task which, if finished, will cancel the current task. No
|
||||||
|
distinction is made for whether the task finished successfully, only that
|
||||||
|
it is finished. Remember that tags can be used to control which tasks contain a
|
||||||
|
given configuration line.
|
||||||
|
|
||||||
|
Example:
|
||||||
|
|
||||||
|
.. code-block:: sby
|
||||||
|
|
||||||
|
[cancelledby]
|
||||||
|
task1:
|
||||||
|
task2
|
||||||
|
task3
|
||||||
|
|
||||||
|
task2:
|
||||||
|
task3
|
||||||
|
task4
|
||||||
|
|
||||||
|
In this example, ``task1`` can be cancelled by ``task2`` or ``task3``, while
|
||||||
|
``task2`` can be cancelled by ``task3`` or ``task4``. If ``task4`` is the first
|
||||||
|
to finish, then ``task2`` will be cancelled, which in turn leads to ``task1``
|
||||||
|
being cancelled. A task can only be cancelled if it has not yet finished, and
|
||||||
|
will check the finished tasks before starting and periodically while the
|
||||||
|
attached engines are running.
|
||||||
|
|
||||||
|
Normally, only the current taskloop is checked for finished tasks. This means
|
||||||
|
that intertask cancellations are not possible across separate SBY invocations or
|
||||||
|
when using the ``--sequential`` flag. By providing SBY with the
|
||||||
|
``--statuscancels`` flag however the status database will be used, allowing
|
||||||
|
tasks to be cancelled independently of taskloop. Note that this also means that
|
||||||
|
a task may be cancelled by a previous invocation unless ``--statusreset`` is
|
||||||
|
called first.
|
||||||
|
|
||||||
|
Example:
|
||||||
|
|
||||||
|
.. code-block:: shell
|
||||||
|
|
||||||
|
sby $sbyfile --statusreset
|
||||||
|
sby $sbyfile a b &
|
||||||
|
sby $sbyfile c d --statuscancels
|
||||||
|
|
||||||
|
In this example, the ``a`` and ``b`` tasks can only be cancelled by each other,
|
||||||
|
while the ``c`` and ``d`` tasks can be cancelled by any task.
|
||||||
|
|
||||||